When storing the electric leaf mulcher + shredder at the end of the season, disassemble the unit and stack the parts in the following order
1. Fit the motor housing into the funnel.
2. Then place the funnel cover onto the motor housing.
3. Store the funnel with the disassembled parts of the frame.
4. Keep all fasteners including the bolts, screws, and knobs together.